KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  10-17-2008
Number of Hours:  1.50
Manual Reference:  11-5 and 11-8
Brief Description:  Trim assembly construction

11-5

Step 3 Removed HS and deburred shims and aft deck holes that were drilled. Waiting to prime before continuing.


11-8

Step 1+2 Fabricate trim bellcrank bracket and cable anchor bracket

Step 3 Deburred and fit F-1095F trim servo spacer to underside of F-1095A trim mount bracket.

Step 4 Clecoed F-1095F to F-1095A via four edge holes. Clecoed F-1095C trim bellcrank brackets and F-1095G trim cable anchor bracket to F-1095A trim mount bracket. Match drilled holes #30.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.