Brief Description: Trailing Edge and forward edge finished
Finished setting final 10 rivets on trailing edge.
step 3 and 4- Rolled leading edges with pipe. Clecoed together and match drilled to #30. Then riveted with AD-41 rivets. Lower two sections pillowed between rivets, so using rivet fan, I marked, drilled and installed additional rivets.