Powered By Kitlog Pro v2.0
Flandy Rv-10
RV-10
Empennage
5-22-2008
< Previous Log Entry
Next Log Entry >
Date:
5-22-2008
Number of Hours:
2.00
Manual Reference:
8-12 to 8-13
Brief Description:
HS Riveting
Installed spar/ stringer assembly and riveted it to nose ribs. Installed outboard ribs (2/side) and riveted to spar,
Started riveting forward spar to skin. Upped all rivet lengths at skin/spar/doubler location by .5. Called out rivets a little too small when driven.
Outbaord ribs attached
Riveting begins
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
1174
3570
Avionics
105
330
Empennage
143
284
Engine
205
918
Fuselage
475
1411
Miscellaneous
11
48
Wings
235
579
Copyright © 2001-2024 Matronics. All Rights Reserved.