Powered By Kitlog Pro v2.0
Flandy Rv-10
RV-10
Empennage
5-4-2008
< Previous Log Entry
Next Log Entry >
Date:
5-4-2008
Number of Hours:
0.40
Manual Reference:
8-9 step 2+3
Brief Description:
HS Assembly cont.
Match drilled rear spar to ribs.
Cleco'd HS-1016 in place. Match drilled to stringers and ribs. First hole off due to cleco not fully engaged. Match drilled that hole to 5/32 and will install 470ad5-4 rivet,
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
1174
3570
Avionics
105
330
Empennage
143
284
Engine
205
918
Fuselage
475
1411
Miscellaneous
11
48
Wings
235
579
Copyright © 2001-2024 Matronics. All Rights Reserved.