Powered By Kitlog Pro v2.0
Flandy Rv-10
RV-10
Empennage
4-17-2008
< Previous Log Entry
Next Log Entry >
Date:
4-17-2008
Number of Hours:
5.00
Manual Reference:
6-4 steps 6+7
Brief Description:
Riveted VS Spar
Primer touch-up on several pieces.
Riveted rudder stops to rudder hinge bracket.
Became proficient at drilling out rivets as pneumatic squeezer had difficult time setting any rivet longer than -5. Very Frustrating!
Riveted Spar caps, spar doubler, and rudder hinge brackets to rudder spar.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
1174
3570
Avionics
105
330
Empennage
143
284
Engine
205
918
Fuselage
475
1411
Miscellaneous
11
48
Wings
235
579
Copyright © 2001-2024 Matronics. All Rights Reserved.