KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  10-13-2016
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Cowling Day #71 and Cooling Ducts Day #18

Waxed both the intercooler mold and oil cooler inlet mold with 5 layers of mold release wax.

Removed intercooler and prepped for glassing.

Installed 2 layers of 7781 glass on the intercooler and oil cooler inlet.

Drilled new inlet backer strips.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.