Powered By Kitlog Pro v2.0
Flandy Rv-10
RV-10
Engine
8-22-2016
< Previous Log Entry
Next Log Entry >
Date:
8-22-2016
Number of Hours:
6.00
Manual Reference:
Brief Description:
Cowling Day #57 and Cooling Ducts Day #3
Started day by grafting new intakes into lower cowling.
Reinstalled turbocharger and intercooler with lower ducting.
Installed lower cowling and started working on aft lower support. Cut hole for oil reservoir blister.
Laid in trashbags on both sides and poured in X-30 expanding foam and left to cure.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
1174
3570
Avionics
105
330
Empennage
143
284
Engine
205
918
Fuselage
475
1411
Miscellaneous
11
48
Wings
235
579
Copyright © 2001-2024 Matronics. All Rights Reserved.