KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  8-18-2016
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Cooling Ducts Day #1

WIth cowling installed, laid in XL trash bag in left low cowling. Poured in X-30 expadning foam and left to cure.

Worked on lower cowling inlet remolding.

After both of the above had cured, removed cowling and started shapingoil cooler air ducting.

Ground out and reglassed several air bubbles in lower cowing and added several layers to inlet reshaping.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.