KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  6-28-2016
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Cowling Day #37 and punch list

Continued sanding and filling cowling to prepare for fiberglassing,

Re-installed the AN-21 controller.

Installed right stick grip and connected wiring- tested OK.

Added wire for Manifold air temperature

Torqued all induction clamps-ready to safety.

Safetied started bolts.

FW to engine fuel line was weeping again, so pulled and returned to TS Flightlines for repair.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.