KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  6-15-2016
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Cowling Day #33 and more

Reinstalled the GSU73 and tied up plumbing and wiring. Reassembled left seat floor and sidewall that I had removed earlier for access.

Trimmed additional baffling to open gap between cowl and baffles.

Removed fuel return temperature probe as it had a small leak. Resealed and reinstalled.

Worked on shaping lower cowling.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.