Finally got the last oil line fabricated with the correct angle at engine connection. Installed and prefilled main and aux cooler with about 1.5 quarts of oil.
Completed installation of cowl flap wiring. Routed wiring out to engine compartment. Tied off all wires and GPS antenna cables along right side of panel to FW. Prepped engine compartment GPS mount for install.
Worked on rough sanding on lower cowl.
Exhaust being modified to allow additonal FW clearance.