KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  5-18-2016
Number of Hours:  7.00
Manual Reference:  
Brief Description:  FWF Day #3 plus more

Right door attach strut broke two days ago. Called Sean at Planearound and he immediately shipped me two new anodized aluminum brackets.

Removed doors and screws and drove out old brackets.

Finished affixing N-numbers and No Step signs on flaps.

Removed aft cabin heat Scat tubing and replaced with longer version. Old one was touching nose gear elastomers. Also installed two adel clamps to support longer tube--that was a CHORE!

Added wire wrap and several standoffs to FW adel clamps.

Connected and checked function (with a heat gun) of EGT and TIT probes.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.