KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  5-6-2016
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Cowling Day #27 and Baffles Day #45

Pulled cowling and started adding glassing filler on the lower section to close several small gaps with the firewall.

Completed drilling left and right forward ramps for rivets. Fabricated outside corner supports for both ramps out of .035 1/2" diameter aluminum tubing. Lower supports will be installed full time, not sure if the uppers will remain. May only use them during no cowl mtc runs.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.