KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  5-4-2016
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Cowling Day #25 and FWF

Trimmed cowling side extensions. Ready for final trimming.

Re-fabricated oil cooler support out of thicker material. Installed adel clamps on prop governor line and adjusted routing. Installed oil cooler and tightened all lines- this took most of the day.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.