KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  5-2-2016
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Cowling Day #23 and FWF

Had a two hours after a trip today.

Received the turbo flange from AWI, the remaining oil and fuel lines from TS Flightlines, and the intake pipes from Trubohoses.

Removed cowling and starting working on building up the aft edges to close the gap between top and bottom.

Loosely installed fuel and oil lines.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.