KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  4-7-2016
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Cowling Day #10 and Baffles Day #30

Top cowl-- added additional layer of glass followed by layer of Soric followed by overlapping layer of 7781 fiberglass. Covered with Peel ply and left to cure.

Fabricated right aft wall support with small air dam for lower holes.

Worked on aft four baffle intersection.

Recieved induction hoses. Temporarily installed to check turbo hanger angle and determine pipe length.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.