KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  3-10-2016
Number of Hours:  5.00
Manual Reference:  
Brief Description:  FWF

Epoxied more foam together for cooler ducts.

Buck came by with prototype elbow--needs adjusting.

Determined 13 inch spinner can be done- in progress.

Installed Fuel filter lines.

Trimmed oil cooler flanges and installed fittings.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.