Powered By Kitlog Pro v2.0
Flandy Rv-10
RV-10
Engine
1-15-2016
< Previous Log Entry
Next Log Entry >
Date:
1-15-2016
Number of Hours:
1.50
Manual Reference:
Brief Description:
Sender lines
Insalled new -4 line between the two oil pressure switches.
Mocked up oil line from crankcase to sender block--- ready for fabrication
" " manifold pressure line to sender block-- fab later
" " prop gov. to accumulator--needs more work before fab.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
1174
3570
Avionics
105
330
Empennage
143
284
Engine
205
918
Fuselage
475
1411
Miscellaneous
11
48
Wings
235
579
Copyright © 2001-2024 Matronics. All Rights Reserved.