KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  1-15-2016
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Sender lines

Insalled new -4 line between the two oil pressure switches.

Mocked up oil line from crankcase to sender block--- ready for fabrication
" " manifold pressure line to sender block-- fab later
" " prop gov. to accumulator--needs more work before fab.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.