KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  1-11-2016
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Prop and throttle cable work

Located and drilled FW for prop cable. Final drill of throttle/prop/alt air cable pass thru will have to wait for engine removal as there is no room to reach.

Routed cable and tested clamps along the way.

Deteremined that I would have to special order the cables with bulkhead fittings to connect to the DJM quadrant. Ordered prop cable and will use it to determine throttle cable length.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.