KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  3-22-2009
Number of Hours:  2.00
Manual Reference:  14-3 to 14-5
Brief Description:  Assebled flap hinges and ribs to wing

14-3 (Left wing)

Step 5 Riveted flap hangers to wing ribs.

Step 6 Clecoed torque tube assembly together and riveted

Step 7 Riveted W-1029C to torque tube assembly and W-1010 rib.

Step 8 Riveted flap hinge to W-1010 rib

14-4 (Left wing)

Step 1+2 Drilled forward tooling hole to 7/16 and inserted snap bushing. Drilled aft tooling hole to 5/8.

14-5 (Left Wing)

Step 1+2 Clecoed ribs to spar
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.