Powered By Kitlog Pro v2.0
Flandy Rv-10
RV-10
All
3-22-2009
< Previous Log Entry
Next Log Entry >
Date:
3-22-2009
Number of Hours:
2.00
Manual Reference:
14-3 to 14-5
Brief Description:
Assebled flap hinges and ribs to wing
14-3 (Left wing)
Step 5 Riveted flap hangers to wing ribs.
Step 6 Clecoed torque tube assembly together and riveted
Step 7 Riveted W-1029C to torque tube assembly and W-1010 rib.
Step 8 Riveted flap hinge to W-1010 rib
14-4 (Left wing)
Step 1+2 Drilled forward tooling hole to 7/16 and inserted snap bushing. Drilled aft tooling hole to 5/8.
14-5 (Left Wing)
Step 1+2 Clecoed ribs to spar
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
1174
3570
Avionics
105
330
Empennage
143
284
Engine
205
918
Fuselage
475
1411
Miscellaneous
11
48
Wings
235
579
Copyright © 2001-2024 Matronics. All Rights Reserved.