KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  3-20-2016
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Cowling Day #4 and Baffles Day #24

Sanded and cut the upper cowl.

Worked on #4 cylinder baffle interconnections. Trimmed and adjusted fit of aft and lower baffle. Drilled, deburred and installed bolts and nuts between upper and lower baffles.

Refabbed upper support as orginal didn't work once everything was connected.

Cut opening in upper and side baffles for return fuel line. Installed adel clamp to support fuel line.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.