KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  8-24-2015
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Misc Multiple Items

Reset the tail stands and set up the cowling to an approximate location.

Trimmed foam to test out possible oil cooler and intercooler locations. Getting CAD work to test location of Pacific Oil cooler parts.

Installed JD Air Parts (Rudder pedal standoffs and fuel vents).

Trimmed right wing root fairings. Worked on left wing root fairings. Trimmed left wheel pant tire opening.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.