Powered By Kitlog Pro v2.0
Flandy Rv-10
RV-10
All
5-12-2015
< Previous Log Entry
Next Log Entry >
Date:
5-12-2015
Number of Hours:
3.00
Manual Reference:
Brief Description:
Panel Work Day#3
Installed new led flood light. Rewired flood light.
Spiral wrapped PFD and MFD wiring as it goes near the GSU73. Completed pitot static line clamp installation.
Worked on installation of GSU73 and GD40 mount.
Tightened left wiring adel clamps and Annunciator wiring clamp.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
1174
3570
Avionics
105
330
Empennage
143
284
Engine
205
918
Fuselage
475
1411
Miscellaneous
11
48
Wings
235
579
Copyright © 2001-2024 Matronics. All Rights Reserved.