Finished elevator installation. Checked torque on all attach hardware and connected control pushrod.
Installed VS and torqued all hardware.
Completed Vor/Loc antenna connection and tail beacon power connections.
Installed rudder and torqued all hardware. Trimmed rudder lower fairing to clear strobe and rudder trim wires and then routed the wires to final locations.