KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  4-14-2014
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Cleanup, interior, and other

With the interior painting and exterior body work complete, it is cleanup time. Stripped all plexi plastic and cleaned windows. Some minor cosmetic imperfections need buffing. Vacuummed lots of dust.

Temporarily installed aft floor tunnel covers. Reinstalled Planearound center cam blocs, Waas GPS antenna, and started installation of door rod blocks and sensor magents.

Installed the aft bulkhead and test fit new carpeting. Much better fit this time. Need to trim aft bulkhead on right side to allow carpet and side panel more clearance.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.