KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  11-26-2013
Number of Hours:  3.00
Manual Reference:  37 and 45
Brief Description:  Fuel system and door repair

Received the fuel lines from TS Flightlines. Started assembling lines to fuel valve. Waiting on Andair for banjo fitting torque requirement before installing valve in plane. Fitted red cubes with NPT fittings and tightened on fuel lines. Installed both cubes in tunnel.

Removed right door from plane. Rivet door hinge attach bracket to door. Began fixing door screw cover that was removed for door repair. Epoxied aluminum plates in place.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.