KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  9-2-2013
Number of Hours:  3.50
Manual Reference:  45
Brief Description:  Fairings Day #3

Sanded windshield lower fairing. Will need more work.

Laid in 6oz followed by 4oz E-glass on upper windshield seam. Possibly one more layer. Hoping this will prevent or at least slow seam cracking. Will do same to side windows.

Sanded filler on both lower door frames. Added more filler.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.