KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  6-23-2013
Number of Hours:  3.50
Manual Reference:  
Brief Description:  GD-40 mount. air vent, beacon

Filed filler base and added more epoxy with fairing filler to work on blending beacon base to fairing.

Fabricated base for GD-40 that fits underneath AHARS mount and holds platenuts for GSU73 attach screws. Drilled, deburred, and dimpled for GSU73 and GD40 attach platenuts. Tested installation for interference and had to trim edge back for better clearance on switch wiring.

Fabricated a mount for the forward air vents. Installed forward side panels to test fit vent mount. Will need to adust a little more.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.