KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  6-4-2013
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Panel Wiring Day #7

Grounded Dome lights / AOA switches /

Connected ELT gps feed/ ground/ power wires.

Finished Fuel pump power and swtich connections.

Finished Taxi light power to fuse block.

Worked on FFDM installation and wire routing.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.