KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  5-22-2013
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Panel wiring Day #5

Completed wiring power and ground to the following:

Main Batt Contactor
Aux Batt Contactor
Alt power switch/breaker
Main Avionics switch
Ess. Avionics switch
Pitot heat power
TCW trim power switch
GPU switch/breaker
Dome Lights

Power connected to

L+R Xfer pumps
Main boost pump

Wired 10 LED annunciator light panel for power and ground input to AN-21 controller.


Added adel clamp for left wire transition support
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.