KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  5-19-2013
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Vent Controllers

Finished heat controller installation by testing actuator travel range and adjusting as required.

Replaced air vent power with a 20awg wire and routed it a little differently. Connected power and signal wires to vent controller only to have one pull out when the connector was difficult to remove from controller. Need to get another and redo.

Connected power and ground wires to heat valve controllers and vent controller.

Connected ground wire to Hobbs meter.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.