Powered By Kitlog Pro v2.0
Flandy Rv-10
RV-10
All
5-2-2013
< Previous Log Entry
Next Log Entry >
Date:
5-2-2013
Number of Hours:
3.00
Manual Reference:
Brief Description:
Ground wires
Connected ground wires for following:
SteinAir wiring bundle equipment
USB power
GDL39
Flap controller
Alternator Regulator
Routed additional wires.
Working underneath the panel is real pain. This would be so much easier without the top skin in place.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
1174
3570
Avionics
105
330
Empennage
143
284
Engine
205
918
Fuselage
475
1411
Miscellaneous
11
48
Wings
235
579
Copyright © 2001-2024 Matronics. All Rights Reserved.