KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  4-8-2013
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Wiring Day #3

Added larger Adel clamps under panel to hold growing wire bundles.

Worked on routing wries along forward side panels.

Completed air vent valve controller wiring connections and ran 22awg wire for 12v power to switch.

Added extension for Elt "phone" cord and routed to switch.

Wired G3x screens and PMA 8000 lighting control wires to Lc-50. Added 6-conductor cable for connection to rheosatats.

Finished running Edc10 wire to left side of panel. Fabricated the D-10a connection harness and PC update cable.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.