KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  3-8-2013
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Electrical planning and install

With fwd fuselage clecoed in place, I started working on roughing in the power distribution system.

Drilled and installed the Avionics relays on both the Main and Essential power distribution panels. With these in place, started working on fabricating wire connections between fuse blocks and relays. Working on routing main power cables from firewall pass-thru to fuse blocks.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.