Brief Description: Vents/ Controller/ Grd Power plug
Started by drilling and riveting overhead vent valve mount to upper J-channel with LP4-3 rivets
Finished side vent control arms by drilling #33 holes/ deburring and checking fit of panels.
Modified the Cole/ Hersee according to a Nuckoll's plan I found online. Trimmed the wire connector to near flange reduction. Ground head of brass bolt to fit inside connector. Soldered in place and filed surface flat for washer contact. Now a ring terminal can be attached instead of soldering wire to plug.