KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  4-21-2012
Number of Hours:  5.00
Manual Reference:  36,38.39
Brief Description:  System Install begins.

Inspected several brake line flare connections under maginification to check for cracking- none noted.

Installed rudder and brake pedal and in fuselage. Installed Bonaco brake line set.

Checked installation and torqued elevator push rods to elevator idler arm.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.