KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  12-22-2011
Number of Hours:  2.50
Manual Reference:  Planearound Plans
Brief Description:  Door Locks Day #2

Following procedure duplicated for both doors.

Marked door 18 3/8" from interior front corner. Cut 13/16" x 2-3/16" slot in bottom of door centered on mark just made. Driled 1/2" hole 29/32" above center mark. Created 1/2" slot to bottom of door.

Removed top of gear box and clamped over top of hole. Drilled #12 the four holes. Mixed structural epoxy/fiber mix and glued the two supplied fiberglass blocks into place.
' style=





' style=




' style=

Christmas comes early!

Christmas comes early!

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.