Finished reaming replacement control stick bushings to 1/4".
Installed Matco axle into nose gear fork. Marked retaining bolt with #10 drill bit. Final drilled to 1/4". Checked final fit.
Deburred wheel fairing mounts for nose and main tires Drilled main axle nuts to 5/16" for
Finsihed trimming inside door shells. Sanded inside of both door shells. Clecoed inner and outer door shells together and then clecoed to open rivet holes on fuselage.