KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  8-3-2011
Number of Hours:  2.50
Manual Reference:  43-5
Brief Description:  Fwd Fuselage and Cabin Cover cont.

Completed riveting the forward fuselage.

Clamped cabin top to both door frames. Match drilled #30 the 25 rivets ahead of the F-1006 bulkhead. Cleaned out drilling dust. Continued drilling down left side and then forward along side skin to the left aft door frame.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.