Powered By Kitlog Pro v2.0
Flandy Rv-10
RV-10
All
5-17-2011
< Previous Log Entry
Next Log Entry >
Date:
5-17-2011
Number of Hours:
3.00
Manual Reference:
33-6,7 + 35-3
Brief Description:
Cont. Floor install
Riveted baggage floors and seat hinges in place. Riveted nutplates on baggage floors and F-1006 bulkhead. Riveted L+R baggage floor angles and lower bagge door seal angle. Need special bulking bar to reach two rivets on door seal angle.
Riveted L+R seat floors in place.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
1174
3570
Avionics
105
330
Empennage
143
284
Engine
205
918
Fuselage
475
1411
Miscellaneous
11
48
Wings
235
579
Copyright © 2001-2024 Matronics. All Rights Reserved.