KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  3-21-2011
Number of Hours:  2.50
Manual Reference:  33-5,6 and 35-2
Brief Description:  Floor Work

Finished dimpling baggage floor ribs and passenger foot well floors. Backriveted the baggage floor stiffeners in place. Riveted nutplates on rear seat pans and foot well floors. Riveted baggage door frame together and clecoed outter skin to frame.

Installed left passenger footwell floor and then went to install the right and realized I was shipped two left floors. Ugh!
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.