KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  11-19-2010
Number of Hours:  2.00
Manual Reference:  29-15 + 16
Brief Description:  More Structure Riveting

Continued riveing the F-1041 and F-1040 fuselage channels. Still have 4 rivets that are difficult to get riveted. Riveted the F-1002 to lower fuselage channel. Riveted the F-1013 L+R longerons to the F-1002J gussets.

Dimpled the F-1088 fuselage ribs, along with the baggage door shims. Started dimpling the F-1069 fwd side skins.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.