KitLog pro

Powered By Kitlog Pro v2.0

Steven's RV-9A
' style=
Date:  6-26-2016
Number of Hours:  6.00
Manual Reference:  Baggage area
Brief Description:  Installed baggage floor and side panels

Before I started this, I had to rivet the baggage ribs to the F-706 frame. I should have done this a long time ago. Big mistake to wait.

I lowered the fuselage onto some 12" saw horses. This improved access a lot, but to work on the floor, I am still leaning over the longeron edge of teh fuselage, to the floor (about 24"). With the cleco's, my chest and stomach took a major bruising.

Finished riveting the ribs.

Purchased some 1/4" soundproofing neopreme from Aircraft spruce. Lined the side baggage panel are and the baggage area floor, then installed the panels.

This is the first time I have used a lot of pop-rivets. OOOOPHA. So much easier. Next time, maybe I'll build a zenith airplane. What a difference!
' style=

Baggage area floor panels

Baggage area floor panels

' style=

F-750 baggage area side panels

F-750 baggage area side panels

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.