KitLog pro

Powered By Kitlog Pro v2.0

Marks Web Site
' style=
Date:  2-12-2011
Number of Hours:  3.00
Manual Reference:  640-V-9/10
Brief Description:  Front channel

I measured out the positions for where ribs 1-4 should be on the front channel, then drilled where the holes should be in the channel first. NOTE: the top and bottom holes would not meet edge spacing requirements on the rib flange if I had drilled them as per the plans, so I adjusted them slightly. I just lined up the holes with the center lines and attached everything. For the "L" angle at rib #5 I attached it to the front channel first, then to the rib.
' style=

Positioning front channel

Positioning front channel

' style=

Channel joint at rib #5

Channel joint at rib #5

' style=

Front channel complete

Front channel complete

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.