Powered By Kitlog Pro v2.0
Steves S-20 Build Site.
S-20 Raven
All
4-19-2015
< Previous Log Entry
Next Log Entry >
Date:
4-19-2015
Number of Hours:
9.00
Manual Reference:
Brief Description:
Assemble Parts Board
Fabricate and populate a parts board. Completed inventory cross check with parts list and found all the parts I was supposed to have.
I used the shipping crate bottom to keep the spars and other long parts off the floor.
EAA workbenches are now storage shelves.
The back side of the parts board.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-20 Raven Home
Category
# Logs
# Hours
All
197
1269
Avionics
10
79
Covering
41
384
Empennage
1
5
Engine
4
11
Fuselage
55
225
Miscellaneous
26
156
Painting
27
268
Prop
1
2
Wings
32
139
Copyright © 2001-2024 Matronics. All Rights Reserved.