Started the aft fuselage. Began removing the hatched areas. F1479B cable guide, F1473A, F-1486DEF Stiffener, F1037ABC Angle, Cleaned up and deburred the cuts.
Step 5. Drilled #30 hole and notched F-1037B
10-03. Step 1. Removed hatched area on the F1486 J Stiffeners.
Step 2. F1418 Longerons trimmed hatched area
Step 3. Seperated F-1410
Step 4. Straightened the F1411 Horizontal attach bars. Easy.
10-04. Fabricated the F1411D Horizontal Stab attach. Time Consuming.