KitLog pro

Powered By Kitlog Pro v2.0

GLENN'S WEB SITE
' style=
Date:  12-5-2013
Number of Hours:  1.80
Manual Reference:  8-20
Brief Description:  inspection cover doublers and covers

Ok, Here is where I did my own thing, Manual calls for every other hole in the doubler. If you do this there is an odd number. Looks like shit. I did all the holes. Looks better. Manual calls for only 3 rivnuts. After I did this, the cover does not lie flat, (flush). I decided to put rivnuts in all of the holes. Looks better. I will do all inspection covers this way.
' style=

cleco

cleco

' style=

3 rivnuts

3 rivnuts

' style=

Cover sticks up

Cover sticks up

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.