KitLog pro

Powered By Kitlog Pro v2.0

GLENN'S WEB SITE
' style=
Date:  11-9-2013
Number of Hours:  2.00
Manual Reference:  8-20
Brief Description:  inspection covers and doublers

Talked with Lockwood about the drilling of every other hole, this does not work. One side ends up uneven. I drilled out all holes to #40, then #29. Will need more rivets. Drilled out 3 holes to 7/32 on covers for riv nuts but to tight. Lockwood say use a #2 instead. Completed all steps except the rivets. I will wait till corrosion protection is complete.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.