Powered By Kitlog Pro v2.0
GLENN'S WEB SITE
AirCam
Vertical Stab
11-4-2013
< Previous Log Entry
Next Log Entry >
Date:
11-4-2013
Number of Hours:
1.50
Manual Reference:
8-11
Brief Description:
Step drilled VS-017 and VS-016
Step drilled VS-017 and VS-016 to #40, then #29, then #19 per the manual.
Skipped step 8-10 corrosion protection until all parts are drilled out.
at #29
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
AirCam Home
Category
# Logs
# Hours
All
284
547
Ailerons
10
16
Center wing
91
229
Elevator trim tab.
6
3
Elevators
22
36
Flaps
6
12
Fuel Tanks
20
43
Fuselage
2
3
Horizontal Stabilize
38
63
Paint booth
1
8
Rudder
19
30
Tools
1
0
Vertical Stab
46
71
Wings
22
33
Copyright © 2001-2024 Matronics. All Rights Reserved.