KitLog pro

Powered By Kitlog Pro v2.0

GLENN'S WEB SITE
' style=
Date:  3-6-2015
Number of Hours:  1.00
Manual Reference:  2-12 Step #6
Brief Description:  Root compression tube to rear spar

Assembled as depicted. Had to squeeze the cuff with a clamp to aligned the holes so as to get the AN43B-34A through. Also installed the wire assembly WI-101.
' style=

Holes drilled to #8

Holes drilled to #8

' style=

Cuff installed

Cuff installed

' style=

1661-0619 rivets

1661-0619 rivets

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.